NEWS

Opening and handing over of the new building aarReha-Zentrum at the hospital Zofingen.

After a construction period of one and a half years, aarReha Schinznach will open its second location on the grounds of the hospital Zofingen on October 1, 2018.

The center was officially opened on Friday, September 28, 2018. After brief speeches by Governing Councilor Franziska Roth (DGS) and Hans-Martin Plüss (Deputy Mayor Zofingen) as well as greetings from the architect and the two directors Beat Schläfli and Christian Reize, the building was ceremoniously handed over to the aarReha for use.

As a symbolic act of cooperation, Freddy Nock walked alternately with the two directors Christian Reize and Beat Schläfli over the high wire connecting the two buildings.
 

… the camera turns into the right position after about 20 seconds …

360 ° video – with pressed mouse button one can look around in the video.

 

Copyright © 2017 by FREDDY NOCK GmbH - The use or duplication of the text or images also in an electronic manner is prohibited. Freddy Nock GmbH assumes no responsibility for the content of linked pages.

© 2017 Copyright - TOMTHINX - created by TOMTHINX TSCHANZ

IMPRESSUM

DATAPROTECTION